Spoke to Shaun and the hole/waste pipe problem is now resolved.
The structural engineer that Fowles engaged came up with a much simplified solution which was approved by building control and the work's been completed!
They had to dig a little further down and then encased the pipe in some padding, put a steel over the top and then filled the hole in with hardcore and then concrete for the footing.
By the time we saw it the wall was already up on top of it!