Showing posts with label shower. Show all posts
Showing posts with label shower. Show all posts

Friday, 18 June 2010

Day 343 - Bathroom roundup


The en-suite shower is working!  I know you can't exactly see that in the picture - but just take my word for it!

And the lovely rust proof but expensive chrome plated brass storage got fitted



The above mirror lights have been moved so they're at the same level (don't ask)


The loo roll holders have been fitted (using the special water cooled drill to cut through the tiles)



And we have a flush on the toilet!

Tuesday, 25 May 2010

Day 318 - Shower cubicle

And in more good news our 3rd shower cubicle has finally been delivered and fitted

The first one was the correct type in the wrong size, the second was the right size but the wrong style (and unfortunately got fitted by the builders)

Finally we have the right type in the right size - hooray


it's a bit difficult to see as the bathroom isn't really big enough to get far enough away for a decent pic

Hooray - another major item to cross off the snagging list.

Wednesday, 28 April 2010

Day 291 - Update on what's left to do

An update after yesterday's site visit

Utility Room build - mostly done apart from sink/tap and some edging
Loft insulation & boarding - boards delivered, installation today
Front Landscaping - Skip and portaloo are going today so stones can go down today/tmrw
Rear Landscaping - Patio and beds are done and turf was laid yesterday
Masticking (not sure I really know what this means though) - some has been done
Bathroom Mirrors (one of these is waiting electrician input) - both are up, but lights need moving in the ensuite
Fire-safe glass above the Fire Door into the indoor shed/storeroom
Remaining lights to be fitted - we bought more lights over the weekend so these are waiting on the electrician
UFH thermostats (again waiting on Electrician I think)
Skirting boards off in the hallway (so they can fit the flooring without needing beading)
Juliet Balcony - waiting for brackets
Glass porch - waiting for custom made bracket
Shower Door in main bathroom - waiting for masticking man

Front Door - joiners visit today to measure up - Door and side panel should've been delivered to them

Cleaners - Booked for May 4th
Decorator - Booked for May 5th

Flooring - we'll book the fitting after the decorator has started and we have a better idea of timing.

Monday, 19 April 2010

Day 282 - Gratutitous Shower Pics

I popped round to the property to meet with Shaun and take a few pics. The sun was shining in through the window into the ensuite and the shower tiles

 
 

I know no-one loves the tiles as much as me but I did think they looked lovely in the sunshine
Posted by Picasa

Saturday, 23 January 2010

Day 202 - More Bathroom updates

 

The shower tray fits!

 
And the tiles are down in the ensuite and the furniture has mostly been built, although we do have an extra cupboard that doesn't fit! The difference between plans and actual build!